Lužany — Intensification and capacitation of wastewater treatment plants

2/22 - 01/23
INZET Ltd
Místo realizace:
Village Lužany

In the village of Lužany we have completed an interesting realization, namely the intensification and capacitation of the existing biological wastewater treatment plant. The wastewater treatment plant will have a total capacity of 700 EO (equivalent inhabitants) from the original 540 EO and will serve for the treatment of municipal wastewater, brought from the municipality. The equipment is designed with minimal operating costs in mind, including electricity consumption and minimal operator demands.

Our work began with the elaboration of the implementation project documentation and continued directly in Lužany by dismantling the wiring of technological wiring, elements of field instrumentation and wiring, including switchboards.

 

The RMS switchboard, which we built in our switchboard production, was placed in the control room of the WWTP. All electrical equipment, MaR elements and building wiring are connected from this switchboard. The control cabinet houses the SCHNEIDER control system, which ensures automatic operation of the entire technology. A control touch panel for control and operation is located on the door of the RMS free-standing cabinet cabinet. Individual devices have local control boxes at the installation site for the possibility of manual control, which are also from our production.


Cabling design, new backbone routes were created from hot-dip galvanized steel wire gutters. Routes to the end elements were made using wiring pipes and cable guards. Separate routes have been created for power cables and MaR cables. All wiring came with copper cores.

During the construction modifications of the wastewater treatment plant building, it was found that the existing grounding system was not in a satisfactory condition. For this reason, a new grounding system had to be designed and implemented, which consists of a perimeter ground strip. An additional protective connection to this grounding system is made at the installation site. The connection is realized by a green-yellow CYA wire with a cross section of min. 6 mm! 2.

In the end, we handed the customer the operational technical documentation, the documentation of the actual design and the initial revision report, including the TIČR.

No items found.

NÁVRH TECHNICKÉHO ŘEŠENÍ

Design activity

PROJECT MANAGEMENT

Tangible supplies

Manufacture of distribution boards

SW CREATION

ASSEMBLY ACTIVITIES

COMMISSIONING

REVISION ACTIVITIES

SERVIS 24/7

Systémy řízení

Mar

Elektro

This seriously

worth noting
You have given us your trust here

When we succeed, we like to brag

We have over 6,000 successfully implemented orders in the energy, chemical industry, water management and other industries.

Location

Blog title heading will go here

Bioplynová stanice Kněžice

Výměna řídícího systému – BPS Kněžice

Žihle Biogas Station

Replacement of the control system — BPS Žihle

Fisheries

Wastewater reception BČOV Pardubice

Vysoké Mýto

Recycling - metové oda.s - Car wrecker tearing machine

Village Lužany

Lužany — Intensification and capacitation of wastewater treatment plants

Hradec Kralove, Schwarzheide

Pilot project BMR — recycling lithium-ion batteries

Projekt číslo 0380000695 byl financován Evropskou unií
„Podpora kreativity ve společnosti SUMO s.r.o.“ – Marketingová strategie a webdesign firemních webových stránek.